Navy Takes Delivery of Offshore Patrol Vessel

(Source: New Zealand Defence Force; issued February 18, 2010)

Chief of Navy, Rear-Admiral Tony Parr and Ministry of Defence Project Director Gary Collier formally accepted the Offshore Patrol Vessel, HMNZS OTAGO, into the Royal New Zealand Navy at a ceremony in Melbourne today.

“OTAGO and her sister ship WELLINGTON will deliver the Navy substantial new capability to undertake Exclusive Economic Zone patrols, surveillance and military operations around New Zealand, the southern ocean and the Pacific,” said Admiral Parr.

“OTAGO and WELLINGTON have the capability to operate further offshore than our existing patrol vessels, stay at sea longer, and conduct more challenging operations – using their helicopter capability, sea-boats and embarked forces.”

Rear-Admiral Parr said it was no secret the Navy had waited longer than planned to get the ships.

“The Navy is now focused on getting these ships into service to do the jobs they were designed for. We’re confident the issues around the ships’ weight, which have contributed to delays in acceptance, can be managed so they can successfully carry out their missions. We wouldn’t have accepted the ships otherwise.”

HMNZS OTAGO is the sixth ship in the Project Protector fleet. Acceptance of OPV WELLINGTON into naval service is expected in April.

Admiral Parr said that with the delivery of OTAGO and WELLINGTON the Navy will be operating a fleet of 12 modern, hi-tech and highly capable ships.

“With the completion of Project Protector the Navy can deliver the full range of maritime military capability from combat and security missions to peacekeeping, border patrol and humanitarian and disaster relief,” said Admiral Parr.

The delivery crew of HMNZS OTAGO will now undertake safety and operational preparations for her voyage to New Zealand. We expect OTAGO to arrive at Devonport Naval Base toward the end of March where she will be welcomed with appropriate ceremony.”

-ends-

Unicorn
20-02-10, 09:32 AM
Another crap job by the former Tenix shipbuilding concern.

No wonder they were sold.

Unicorn

ADMk2
22-02-10, 02:26 AM
“With the completion of Project Protector the Navy can deliver the full range of maritime military capability from combat and security missions to peacekeeping, border patrol and humanitarian and disaster relief,” said Admiral Parr.


As long as your idea of combat capability is measured against the capability inherent within the South Pacific, I suppose this is a fair enough statement...

Milne Bay
25-03-10, 12:20 AM
HMNZS Otago's Voyage Delayed


(Source: New Zealand Defence Force; issued March 22, 2010)



The homecoming of the newest member of the Royal New Zealand Naval Fleet, Offshore Patrol Vessel, HMNZS Otago, has been delayed due to faults found in her engines.

Otago was carrying out sea trials off Melbourne to test her systems when the faults were found.

The initial investigation has identified that the issues need to be rectified before departing for Devonport Naval Base and Otago is alongside in Williamstown.

Technicians from the engine manufacturers M.A.N, and the ship’s builders BAE, in Melbourne, are working with the ship’s engineers to repair the faults.

It is expected that the repairs will delay the delivery voyage by some days as parts may have to be sourced from overseas.

HMNZS Otago is under warranty.